Select the Customize and Add to Cart button to access the configuration options and follow the simple steps below.
Step 1 – Synergy Manager: Make sure the desired inverter is selected.
Step 2 – Synergy Units: Choose a secondary unit. There are two options in the dropdown.
3 units without Rapid Shutdown System
3 units with Rapid Shutdown System
Based on a unique commissioning process for rapid system installation
Pre-commissioning function for automated validation of system components and cabling during the on-site installation process and before connection to the power grid
Easy installation by two people with a lightweight modular design (each inverter consists of 2 or 3 Synergy units and a Synergy Manager)
Independent operation of each Synergy unit ensures longer operating time and easy maintenance
Built-in thermal sensors detect faults in cabling and provide enhanced protection and safety
Built-in arc protection and optional quick shutdown
Built-in PID recovery function for maximum system performance
Monitored* and field-replaceable surge protectors to better withstand overvoltage caused by lightning or other events: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD
Optionally integrated DC circuit breaker, eliminates the need for external DC load breakers
Built-in panel-level monitoring with Ethernet or GSM communication for full system visibility
*Only applicable for DC and AC SPDs
View all of our SolarEdge inverters